TESPL offers following services to evolve a project configuration suitable for specific industry

  • Feasibility study forWHRS or WHRPP
    The evaluation and implementation of WHRS or WHRPP in the existing or Green Field Plant requires elaborate feasibility study involving following activities,
    • Understanding the process flow diagram and available sources of waste heat for conversion into power.
    • Integration of Waste Heat Recovery System with process plant.
    • Location and layout of major components of the Waste Heat Recovery based Power Plant
    • Estimation of detailed project cost, especially for the following activities –
      • Estimation of equipment supply
      • Civil and structural work
      • Modifications required for integration of WHRS
      • Interconnecting piping and ducting between various equipments
      • Power generation and power evacuation package
      • Auxiliaries and miscellaneous activities.
    • Statutory compliances & approvals
  • DPR preparation
    A detailed project and feasibility report including above activities is essential for successful implementation of the project within budgeted time frame and costs. Final report from this exercise typically contains following major information,
    • Tabulated reports giving gross & net power output for given conditions
    • Techno economical comparison table
    • Proposed plant layout super imposed on the existing plant layout
    • The brief specifications of all major equipments / packages in the total project
    • Cost estimates for all equipments / packages comprising the total project
    • Time schedule and bar chart for the project
    • Financial payback calculations
    • Estimated Carbon credits that can be obtained
  • Design & Supply of Equipments
    Based on the recommendation arrived by TESPL after thorough study of potential for waste heat recovery based power generation TESPL designs the equipments necessary to deliver the solution and achieve the committed power generation. The manufacturing facilities of TESPl are ISO 9001:2008 certified by TUV NORD and are approved Boiler & Pressure Parts manufacturing units as per Indian Boiler Regulation 1950. These facilities also hold S, U, U2, R, HP0, DIN EN ISO 3834 certifications.
  • EPC Partner
    TESPL has experience of more than a decade as an EP /EPC partner for installation of WHRSand WHRPP in variety of industries. Years of experience in delivering pioneering solutions for WHRS and WHRPP coupled with robust engineering methodologies and professional project management make TESPL the most dependable EP/EPC partner.

    To save on the overall project cost, TESPL also offers an EP solution. In this solution, TESPL takes care of all design engineering, supply, and commissioning services. The site construction is taken care by the customer based on the engineering provided by TESPL.